Question: Question. No . 1 [ 2 0 marks ] a ) Explain with the aid of diagrams, the differences between Stone Columns and Geopiers in
Question. No
marks
a Explain with the aid of diagrams, the differences between Stone Columns and Geopiers in terms of application, installation and purpose.
b Explain the difference between MSE and RSS Slope Stabilization. Discuss and illustrate with diagrams the differences and application of each method
c Describe with the aid of diagrams the pros and cons of using lightweight fill
d Given the following;
i A warehouse development is to be done off Mandela Highway. The buildings are expected to be of Steel portal frame. The geotech report indicated that the upper m comprised of m of soft to very soft CH soils overlying very stiffhard CH clays with water table m below ground surface
ii In Port Royal a land side structure and foundation is to be designed to support a cantilevered floating bride that extends m seaward to the cruise ships. The upper m of soils are loose to compact silty sands overlying dense sands with high water table m
iii The embankment along the Gordon Town Road had a steep side slope wedge failure during heavy rainfall. The river is adjacent to the slip, about ft below road level and only about ft away from the edge of the road.
For each case recommend a suitable or combination thereof and economical soil modification techniques that will mitigate the anticipated major engineering considerations
Note please use diagrams to illustrate your answers where necessary
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock