Question: QUESTION ONE [ 5 0 ] Read the scenario below and answer the following questions: Managing Supplier Quality: Integrated Devices Bill Edwards is a quality

QUESTION ONE [50]
Read the scenario below and answer the following questions:
Managing Supplier Quality: Integrated Devices
Bill Edwards is a quality engineer assigned to the Injected Molding Commodity Team at Integrated Devices. The commodity team is responsible for evaluating, selecting, and negotiating agreements with plastic-injected molding suppliers to be used throughout Integrated Devices. The team is also responsible for improving service quality and material that Integrated Devices receives from its suppliers. Bills role after supplier selection involves working directly with suppliers that require training or technical assistance concerning quality control and quality improvement.
The company spends about 70% of each sales dollar on purchased goods and services, so suppliers have a major impact on product quality.
Bill just received a call concerning a recurring manufacturing problem at Integrated Devices Plant No.3. The plant buyer said the plant is experiencing some quality variability problems with a key plastic-injected molding component supplied by Trexler Plastics. The component is sometimes too short or too long to fit properly with other components within the finished product. On occasion, the bracket snaps, causing endproduct failure. Although the unit cost of the plastic-injected molding component is only $1.55, these quality issues (length variability and snapping) are creating production problems that far exceed the components purchase price.
The local buyer announced he was having difficulty resolving the problem and asked for support from the corporate commodity team. The buyer said, You corporate guys selected this supplier that we all have to use. The least you can do is to help us out of the jam your supplier choice is causing. The buyers comment surprised Bill, although Bill would soon come to understand that plant personnel resented not being able to select their own suppliers.
After investigating the problem during a tension-filled meeting with Plant No.3 personnel, Bill determined he would have to visit the supplier directly. He would work with Trexlers process engineers to address the manufacturing variability caused by the nonconforming component. Bill went back and reviewed his teams actions when selecting a single supplier to provide an entire family of plastic-injected moldings.
Trexler had quoted the lowest price of all competing suppliers and had provided samples that passed Integrated Devices engineering tests.
Upon his arrival at the supplier, Bill learned that Trexler did not have a dedicated process engineer. One engineer, Steve Smith, was responsible for plant layout, process, quality, and industrial engineering. This individual, who was hired only two months previously, was still becoming familiar with Trexlers procedures. When Bill asked to review the suppliers quality control procedures, Steve had to ask several people before he could locate Trexlers procedures manual.
Bill decided that his first step should be to understand the process responsible for producing the defective component. At an afternoon meeting, Bill asked Steve for actual output data from Trexlers process. Steve explained they did not collect data for process capability studies or for statistical control charting of continuous production. However, he did say that sometimes things dont seem to be operating well with the equipment that produces the component. Trexler uses an inspector to examine every finished item to determine if it should be shipped to the customer.
After explaining the basics of process capability to Steve, Bill asked him to collect data from the process that produced the bracket component. Bill requested that Steve take exact measurements periodically from the process so they could draw statistical conclusions. Bill said he would return in three days to examine the data.
Upon his return three days later, Steve shared with Bill the details of the data collection effort (see Exhibit 1).
Component: #03217666 Description: Bracket
Design specification: 4\pm 0.06 inches
Once Bill calculated a preliminary process capability from this data and examined the training and quality control procedures at Trexler, he realized he had some serious work ahead of him.
Questions:
1.1
Provide an overview of Integrated Device's purchasing function. What is the role of purchasing in the company's overall operations, and how does it contribute to achieving business objectives? (25)
1.2
Analyse the criteria Integrated Device uses to evaluate and select suppliers. Outline the key factors that the company should consider when choosing suppliers for its purchasing needs. (25)
QUESTION TWO [20]
Explore the role of cost reduction as one of the key objectives of purchasing and supply management. How can organizations achieve cost reduction through effective purchasing strategies? Substantiate your discussion with practical examples.
End of assignment questions

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!