Question: QUESTION ONE [ 8 0 MARKS ] Optimizing transport costs for Polokwane Logistics Concepts ( PLC ) Polokwane Logistics Concepts ( PLC ) is a
QUESTION ONE MARKS
Optimizing transport costs for Polokwane Logistics Concepts PLC
Polokwane Logistics Concepts PLC is a logistics company specializing in road transport services across South Africa. PLC faces a significant challenge in managing and optimizing its transport costs due to the diverse and extensive nature of its operations. Recently, the company has taken on a new client requiring a shipment to be transported from their warehouse in Soweto to a consignee in Cape Town. Given the rising fuel prices and competitive market, PLC needs to ensure its pricing strategy covers all operational costs while remaining competitive. The following information regarding an upcoming trip to Cape Town is provided.
Equipment Cost Data:
Equipment Purchase Price:
Linehaul tractors: R
Linehaul trailers: R
Depreciation:
Tractors: year straight line
Trailers: year straight line
Interest:
Tractors: annual percentage rate APR for years
Trailers: APR for years
Fuel:
R per litre for diesel
Linehaul tractors: KM per litre or R per KM
Labour:
Linehaul drivers: R per KM
Pickup and delivery PUD drivers: Rfully loaded per hour
Dock workers: Rfully loaded per hour
Miscellaneous costs:
Insurance cost: R per KM
Maintenance cost: R per KM
Billing cost: R per freight bill
Tractors and trailers are available for use hours per day, days per year
Administrative overhead cost: of total cost of move
Dock facility cost: R per hour
Linehaul vehicle averages kph between origin and destination
Route and Time of Move:
A shipment will originate from the PLC warehouse located KM from the carriers dispatch facility on August. A line haul tractor and trailer are dispatched from the terminal at hrs and arrive at the shippers dock at hrs The shipment is loaded from hrs to hrs Driver and vehicle return to the carriers terminal at hrs to pick up paperwork.
Total time for pickup: hours
Total distance for pickup: KM
The vehicle and the driver depart from the terminal at hrs on the same day for Cape Town, Western Cape. The driver operates from hrs to hrs and travels KM The driver rests from hrs to hrs on August in Bloemfontein and then operates another hrs hrs and KM The driver rests again from hrs to hrs in Beaufort West. The driver concludes the trip by traveling KM from hrs to hrs August to the consignee in Cape Town.
Total time for linehaul: hours or days
Total distance for linehaul: KM
The trailer is unloaded from hrs with the driver and tractor remaining at the facility. The driver and the vehicle then go to the carriers Cape Town terminal located KM from the customers facility arriving at hrs to wait for further dispatch instructions.
Total time for delivery: hours
Total distance for delivery: KM
Business Problem:
PLC needs to accurately calculate the costs associated with this shipment to determine a competitive price that covers all operational expenses, including fuel, labor, depreciation, interest, and miscellaneous costs. Additionally, the company must include VAT and desired profit margin in the final price.
Required
Calculate the pickup cost marks
Calculate the linehaul cost marks
Calculate the delivery cost marks
Calculate the total costs for this move marks
Determine the price to be charged for this trip marks
QUESTION TWO MARKS
Imagine that you are an operations manager of PLC and provide insights on how you can minimise operational costs to be competitive. Your answer can include the application of relevant technologies
QUESTION THREE MARKS
Evaluate contextual issues unique to South Africa can increase the cost of freight transport and distribution.
TOTAL: MARKS
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock