Question: QUESTION PART A ( 1 5 % ) As the company Plants and Operation Manager, you have been requested by your company director to provide

QUESTION
PART A (15%)
As the company Plants and Operation Manager, you have been requested by your company director to provide a report that describes (C1) your process of choosing construction equipment for your current job. In the report, you must explain (C3) with in-depth knowledge (WP1) the wide range of conflicting requirements (WP2) regarding the specifications of each machine that has to be checked and fulfilled, in designing the system of the most compatible loader-hauler combination. The target is to select the most productive selection in terms of time and cost, based on the best engineering practice (WK6) that requires abstract thinking (WP3). Find a feasible selection of loader-hauler, or excavator-hauler or scraper alone, for an earthmoving operation to move approximately 35,000 bank cubic meters of sandy clay to be dumped about 1.5 km away.
PART B (15%)
After comparing (C2) a wide-range (WP2) of possible plants combination for the given function and operation, and using the designed selection system (WK5) based on best engineering practices (WK6) that require abstract thinking (WP3) in PART A, analyse (C4) the total resistance of the plant movement using in-depth knowledge on interdependency, to develop the Total Resistance graph for the hauler when:
a)hauling fully loaded
b)return empty
The format of the graph is as shown below in Figure 1.Figure 1
Total Resistance Chart
QUESTION PART A ( 1 5 % ) As the company Plants

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!