Question: QUESTION PART A ( 1 5 % ) As the company Plants and Operation Manager, you have been requested by your company director to provide
QUESTION
PART A
As the company Plants and Operation Manager, you have been requested by your company director to provide a report that describes C your process of choosing construction equipment for your current job. In the report, you must explain C with indepth knowledge WP the wide range of conflicting requirements WP regarding the specifications of each machine that has to be checked and fulfilled, in designing the system of the most compatible loaderhauler combination. The target is to select the most productive selection in terms of time and cost, based on the best engineering practice WK that requires abstract thinking WP Find a feasible selection of loaderhauler, or excavatorhauler or scraper alone, for an earthmoving operation to move approximately bank cubic meters of sandy clay to be dumped about km away.
PART B
After comparing C a widerange WP of possible plants combination for the given function and operation, and using the designed selection system WK based on best engineering practices WK that require abstract thinking WP in PART A analyse C the total resistance of the plant movement using indepth knowledge on interdependency, to develop the Total Resistance graph for the hauler when:
ahauling fully loaded
breturn empty
The format of the graph is as shown below in Figure Figure
Total Resistance Chart
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
