Question: QUESTION: RATE - BUILD UP , MATERIAL SCHEDULING AND PRICING Using the data on Annexure A , prepare a material schedule ( typed in calibri

QUESTION: RATE-BUILD UP, MATERIAL SCHEDULING AND PRICING
Using the data on Annexure A, prepare a material schedule (typed in calibri fond size 11), rate build-up
(manual) for each bill item and price all the bill items on the annexture. Attach quotations from suppliers as
substantiation and indicate any reasonable assumptions made where necessary. Your submission should
include the following:
Material Schedule
Rate Build up sheets
Priced BOQ
Substantiation
TOTAL
: 15 Marks
: 30 Marks
: 10 Marks
: 5 Marks
BILL OF QUANTITIES
Item
Description Unit Quantity Rate (N$) Amount (N$)
1 Excavate surface to depth n.e.2m M330
2 Ditto hard pickable M35
3 Ditto rock M32
4 Backfill surface trenches using in-situ
material and compact to 90% MODAASHTO
density in successive layers of 150mm thick
M310
520mpa concrete footing M35
6220mm foundation brick wall, type 14 mpa M2120
7110mm Ditto M260
8 Hardcore M315
925 Mpa concrete floor slab M310
10220mm superstructure brick wall, type 7mpa M2300
11110mm ditto M2
200
12 Subtotal N$
13 Add: Contingency (20%)
N$
14 Subtotal N$
15 Add: VAT (15%) N$
16 TOTAL AMOUNT
N$

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!