Question: QUESTION TWO: ( 2 0 MARKS ) As a Chief engineer, you neod to come up with the cash flow estimate for a newly proposed

QUESTION TWO: (20 MARKS)
As a Chief engineer, you neod to come up with the cash flow estimate for a newly proposed
production line. Initially, the system is designed to have a maximum capacity (Cmax) of six
million parts to produce per year, but the demand is expected to grow at an annual compound
rate of 10%. Whenever the annual demand reaches 80% of the maximum designed capacity,
the maximum designed capacity must be doubled in the subsequent ycar. The cost of meeting
these future demands, as well as other projected financial data, are as follows:
Cost of building the production system as a function of maximum designed capacity:
1.5M+0.5(Cmax)0.7.
Initial demand =3 million parts per year.
Demand growth rate =10% per year.
Project life =15 years.
Revenucs per year = demand during year n(5)1.05.
Expenses per year =$12,000+ demand during year n(2)1.08.
Estimate the project cash flows over the project life. Tabulate your results

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!