Question: QUESTION TWO A company purchased 2 , 5 0 0 meters squared ( 2 , 5 0 0 m 2 ) of land on which
QUESTION TWO
A company purchased meters squared of land on which the following buildings were constructed at a total cost of $ All of the buildings were brought into productive use at the same time, on January
i A factory and administrative office block costing $ in total, which was built entirely of concrete. Machinery and equipment were subsequently installed. See also note iv
ii A canteen, restroom facilities and a sickbay for the factory staff costing $ constructed of concrete. There was no machinery in this building.
iii The balance of the cost of $ was expended to construct a combination showroom and shop space to sell the manufactured items to customers desirous of purchasing at the low factory price. The building was constructed out of a new material, derived entirely from supercompressed bamboo and wood fibres.
iv The administrative offices were constructed adjacent immediately adjoining without an intervening space and sharing a common wall to the factory building. These offices were constructed out of concrete. It was difficult to determine the separate cost of the offices as a part of the $ factory cost overall. However, measurements according to the floor plan, yielded the following details:
tableBuilding Use,Area OccupiedFactory
APPENDIX
NB: Annual Allowances are to be calculated on the straightline basis unless specifically indicated otherwise.
tablePlant
APPENDIX
NB: Annual Allowances are to be calculated on the straightline basis unless specifically indicated otherwise.
tablePlant
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
