Question: Question Two You are the project manager for the project below. Your client has indicated a desire to reduce the project duration by 6 months.

Question Two You are the project manager for the project below. Your client has indicated a desire to reduce the project duration by 6 months. The various activities in the table below represent the critical path of the project. A. In order of priority, which of the activities in the table below will you crash to reduce the project duration by 6 months and what will be the cost implications? B. What will be the optimal cost of the project when the duration is reduced by 5 months? C. What is the maximum crash time for the entire project, and what is the optimum cost implication of the maximum crash time? D. What are the things you can do on the project to reduce the project duration without spending additional resources? Activity Original duration (mth) Crash duration (mnth) Maximum crash time Original cost Crash cost / mth ($) (S) J 14 12 2 10k 2k K 9 8 17k 10k Z 3 2 1 25k 1k L 7 2 14k 3k 5 8 M 11 3 27k 3k
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock