Question: QUESTIONS Please write basicly the steps of Making Cake by categorizing them considering the pyramidal structure of work: Task - Work Elements - Basic Motion

QUESTIONS
Please write basicly the steps of "Making Cake" by categorizing them considering the pyramidal structure of work: Task-Work Elements-Basic Motion Elements (using therbligs). Also use Activity Chart Shadings for your steps.
Read the sentences below, carefully. If you think the sentence is True or False, then write (T) or (F) inside the paranthesis. Also, if you think that a sentence is False, then write the truth of it.
() Gantt Chart is an activity chart type.
() Interruptions in a process are examples of fatigue allowances.
() PDCA means "Planning, Documenting, Classifying Allowances".
() Required time for a work element is six seconds or longer.
() Fake and effect diagram is a data collection and analysis tool.
The normal time to perform a certain manual work cycle is 5.20 min . In addition, an irregular work element whose normal time is 5.55 min . must be performed every 10 cycles. One work unit is produced each cycle. The PFD allowance factor is 14%.
a) Determine the standard time per piece.
b) How many work units are produced during an 8-hour shift at 100% performance, when we include allowances?
c) If the actual cycle time of a worker is estimated as 4.80 min . per piece and if he works 7.2 hours during a regular shift, how many units are produced by the worker?
d) Calculate the actual output in terms of standard hours.
e) Find the worker efficiency.
The Formulas:
Tc=TnPw
Tstd=Tn(1+Apfd)
Hstd=Q**Tstd
Ew=HstdHsh
Please write the general names of activities for each step considering process chart of right-hand/left-hand, given below
a) Make comments on the general process:
If the method is the best or it must be improved? If it needs to be improved, then explain that which steps to be followed, which questions to be asked,etc.
b) Propose alternatives to improve the method if you think an prove that it is not a good method.
5. Please write the long (full) forms of the abbreviations below:
TPM, MRPI, MRPII, SMED, BOM, CPM, DC, wip , ERP, 5S.
 QUESTIONS Please write basicly the steps of "Making Cake" by categorizing

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!