Question: R3. 66: For a time-ordered variable control chart, what is the primary reason why subgroups should be kept as small as possible? A. So ranges
R3. 66:
For a time-ordered variable control chart, what is the primary reason why subgroups should be kept as small as possible?
- A. So ranges could be used instead of standard deviations
- B. To have the minimum opportunity for variation within a subgroup
- C. To save time
- D. So control limits may be narrower
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
