Question: Re - do problem 8 a with the modification that job D is IO bound. After each 5 0 0 ms it is allowed to

Re-do problem 8a with the modification that job D is IO bound. After each 500ms it is allowed to run, it blocks for an IO operation that takes 1s to complete. The IO processing itself doesnt take any noticeable time. Assume that jobs moving from the blocked state to the ready state are placed at the end of the run queue. If a blocked job becomes runnable at the same time a running processs quantum is up, the formerly blocked job is placed back on the queue ahead of the other one.