Question: Reliable Part Co . Has signed a contract with a farm - equipment manufacturer for 1 0 0 , 0 0 0 parts to be
Reliable Part Co Has signed a contract with a farm equipment manufacturer for parts to be delivered
uniformly over one year. Each part is going to be processed sequentially in three departments pressing drilling,
and grinding with the following production data. Assume that company operates days per year.
Departments
Pressing Drilling Grinding
Working time available day hours hours hours
Processing time part min min min
Average down time day min min min
Average nonproductive day min min min
Percentage of defectives
a pts Determine the working minutes per day, reliability of machines, and actual performance efficiency
for each department.
b pts Determine the required daily production input for each department if all defectives are discarded as
scrap.
c pts Determine the machine fractions required for each department.
d pts The effect on equipment requirement if the company were to go on two shift x hrsday
e pts As a result of a recent preventuremaintenance program the average down time in each department
was reduced by Determine the effect on equipment requirement
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock