Question: Remember: all units must be consistent! ( i . e . gal / min must be converted to m 3 ? day, etc... ) Dewatering
Remember: all units must be consistent! ie galmin must be converted to day, etc...
Dewatering an Excavation Site points
It is necessary to lower the groundwater level in an unconfined aquifer in the area of an excavation pit by means of fully
penetrating wells arranged along the contour of the pit. The initial saturated thickness is the hydraulic conductivity of the
aquifer is day, and the specific yield is To secure the necessary conditions for the excavation pit, the groundwater level at
the center of the pit point needs to be lowered by relative to the present value within days of pump operation.
a Assuming that each well operates at the same capacity, what is the minimum required pumping rate day to achieve
the of drawdown within days?
b For the pumping rate found in a provide a time series of drawdown at point for the first years of operation.
c Using the TheisDrawdownSimulator spreadsheet VBA program, show a map of drawdown at time days.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock