Question: rep - 1 sur.pdf Report 1 : Linear Survey In this report you - as a group - will perform the procedure of linear survey

rep-1 sur.pdf
Report 1: Linear Survey
In this report you-as a group- will perform the procedure of linear survey in a local site. THE group will conduct a linear survey experiment. Experiment is started by choose a site location, making a field framework then conducting chosen points offsetting. The framework of the four sides is the most important step in this experiment. Offsetting steps will be conducted to measure many of selected points in the field. Rulers is required to book all the measurements. The equipment that will be used in measurement will be provided for you in the lab location.
Detailed Linear Survey Steps using Offsetting:
1- field sketch
2- choosing framework points- conditions for framework points (inter-visible, stationary, check control points)
3- take framework lines measurements
4- offsetting measurements ( methods of taking vertical lines from a point to a defined line, method of taking a vertical line from a point in the line)
5- measurements booking
6- take control measurements
7- draw surveyed location to a propriate scale
8- Conclusion regarding areas, obstacles,...
Set up task:
instrument calibration
centering
pointing
matching
setting
comparing
reading
Report contents:
1- As per ABET requirements
Please, write down your group name in cover page
1|Page
(
Teams
rep - 1 sur.pdf Report 1 : Linear Survey In this

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!