Question: rep - 1 sur.pdf Report 1 : Linear Survey In this report you - as a group - will perform the procedure of linear survey
rep sur.pdf
Report : Linear Survey
In this report youas a group will perform the procedure of linear survey in a local site. THE group will conduct a linear survey experiment. Experiment is started by choose a site location, making a field framework then conducting chosen points offsetting. The framework of the four sides is the most important step in this experiment. Offsetting steps will be conducted to measure many of selected points in the field. Rulers is required to book all the measurements. The equipment that will be used in measurement will be provided for you in the lab location.
Detailed Linear Survey Steps using Offsetting:
field sketch
choosing framework points conditions for framework points intervisible, stationary, check control points
take framework lines measurements
offsetting measurements methods of taking vertical lines from a point to a defined line, method of taking a vertical line from a point in the line
measurements booking
take control measurements
draw surveyed location to a propriate scale
Conclusion regarding areas, obstacles,...
Set up task:
instrument calibration
centering
pointing
matching
setting
comparing
reading
Report contents:
As per ABET requirements
Please, write down your group name in cover page
Page
Teams
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
