Question: Req. 4 : The production engineers have also given you the production labor requirements for each individual bag produced, assuming one bag is produced at

Req. 4: The production engineers have also given you the production labor requirements for each
individual bag produced, assuming one bag is produced at a time:
Cutting time: 30 minutes per bag;
Sewing time: 70 minutes per bag;
Ironing time: 8 minutes per bag
Since each bag must be sewn and ironed individually, no sewing and ironing labor efficiencies can be
achieved by producing larger batch sizes. Recall, however, that fabric can be stacked for cutting
purposes, such that the material for four bags can be cut in the same amount of time it would take to
cut one individual bag. Compute the estimated labor time requirement for producing Job 114.
TOTAL hours required for Job 114: _________
Req. 5: Use the estimated labor time requirement to schedule production of Job 114, including the
start and end dates. Assume the plant will already be operating at full capacity every day while
completing Jobs 111,112, and 113. Also assume that only 4 direct laborers with the needed skill set will
be available for this job. These hourly employees are only allowed to work a maximum of 8 hours per
day so that the company can avoid paying overtime premiums.
Req.6: In addition to the direct materials shown on the Bill of Materials, what indirect materials might
be used in the factory while Job 114 is being produced? List at least 2 items
Req. 7: What types of production equipment will be needed for producing Job #114? List at least 5
items.
3
Production Schedule
For the month of October
Job Model Number Stock or
Customer
Quantity Scheduled
Start Date
Scheduled
End date
111 Headbands - HB246 Perreth 20010/110/3
11214 inch pillows- P14 Slothower 3010/410/5
113 Draperies- GB159 Stock 8010/610/9
114 Black & White BW14923 Katies & stock
Req. 8: Consult the Raw Materials records to determine the types and quantities of materials you
currently have in stock. Determine which types of materials you need to purchase for Job 114 and how
much of each youll need. List the materials that need to be purchased, along with the quantity of
each needed:
Req. 9: Complete the purchase orders (supplier, date needed, item number, quantity, cost, total, total
for the whole order) assuming you are only buying what you need for this job, and no other jobs.
Your purchasing agent will need to check with your authorized suppliers (JoAnne Fabrics and Hancack
Fabrics) to determine the current sales price of the materials. No shipping is charged on purchases
orders over $50. Note: Both suppliers only allow you to order in increments of 5 yards at time, so you
may have to buy a little more than what you need. This is not a problem for your company, as it can
always use large pieces of leftover material for other jobs. Custom Fabric Ventures also has a standing
contract with Mattel to produce clothing for the Barbie and Ken line of dolls. Thus, small fabric
remnants can always be used for the toy clothing line.
Purchase Order
Supplier:
Date ordered: 10/3
Date needed by:
Item Number Quantity Cost per yard Total Cost
TOTAL $
Purchase Order
Supplier:
Date ordered: 10/3
Date needed by:
Item Number Quantity Cost per yard Total Cost
TOTAL $
Briefly explain why you chose to purchase certain materials from each supplier:
4
Req. 10: Assume shipments of all supplies arrive on 10/9. Your receiving personnel have checked the
receipts against the Purchase Order and Invoice, and have noted no discrepancies in the ordered
quantities or prices. Since the company keeps perpetual inventory records, update the Raw Materials
Records for the materials received and the new balance in stock. Update both the physical quantities
and costs. The company uses FIFO as its inventory flow assumption. If needed, keep track of separate
inventory price layers.
Req. 11: Assume for a moment that the Raw Material Records given to you represent a complete list of
the raw materials carried by the company. If you were to look at the Balance Sheet at the close of
business on Oct. 9, what balance would be shown for Raw Materials Inventory? (Show the total
balance and how you arrived at it.) $__________________
Req. 12: The scheduled start date for the job has arrived. In order to begin production the materials for
the job are needed in the plant. Production would like to requisition all needed materials at one time.
Complete the Materials Requisition (fill in the date, Job #, and quantity needed) so that the inventory
storeroom personnel know the quantities and types of material to pick.
Materials Requisition
Number: #6786
Date:
Job:
Part
number
Description Quantity
Needed
Unit Cost Total Cost
BWFF Black and White Floral Fabric
BWCheck Black and White Checkered Fabric
BFringe Black Fringe Trim
BStrap Black shoulder strapping
PlCan Plastic Canvas
Int4 Interfacing: Level 4 rating
Total
Req. 13: The storeroom personnel correctly pick the direct materials and send them to production.
Complete the cost

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!