Question: Required: a. Assign overhead costs to activity cost pools using activity-based costing. b. Calculate activity rates for each activity cost pool using activity-based costing. c.

 Required: a. Assign overhead costs to activity cost pools using activity-based

Required:

a. Assign overhead costs to activity cost pools using activity-based costing.

b. Calculate activity rates for each activity cost pool using activity-based costing.

c. Determine the amount of overhead cost that would be assigned to each product using activity-based costing.

d. Determine the product margins for each product using activity-based costing.

Groleau Corporation has an activity-based costing system with three activity cost pools--Processing, Setting Up, and Other. The company's overhead costs, which consist of factory utilities and indirect labor, are allocated to the cost pools in proportion to the activity cost pools' consumption of resources. Costs in the Processing cost pool are assigned to products based on machine-hours (MHs) and costs in the Setting up cost pool are assigned to products based on the number of batches. Costs in the Other cost pool are not assigned to products. Data concerning the two products and the company's costs and activity-based costing system appear below: Factory utilities (total) Indirect labor (total) $35, 100 $12,900 Distribution of Resource Consumption Across Activity Cost Pools Processing 0.40 Setting Up Other 0.30 0.50 0.10 Factory utilities Indirect labor 0.30 0.40 Product S8 Product F1 Total MHS 3,200 7,900 11,100 Batches 900 500 1,400 Sales (total) Direct materials (total) Direct labor (total) Product 58 $81,800 $26,600 $33,900 Product F1 $ 100, 200 $ 37,400 $ 41,600

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!