Question: REQUIRED : a. Compute the predetermined overhead rate b. Determine the unit overhead cost of each product under traditional costing c. Determine the unit overhead

REQUIRED :

a. Compute the predetermined overhead rate

b. Determine the unit overhead cost of each product under traditional costing

c. Determine the unit overhead cost of each product under ABC system

d. Significance of ABC costing

e. Difference between the two costing systems

f. Budgeted vs Idle Capacity

g. Competition on Price

h. Advise to Wolseley Inc.

Wolseleys dilemma of Traditional Costing versus Activity Based Costing

Wolseley Manufacturing Corporation manufactures various electronics products and follows a traditional (job-order) costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labour-hours (DLHs). The company has two products, C18R and G19R, about which it has provided the following data:

C18R

G19R

Direct materials per unit

$10.20

$50.50

Direct labour per unit

$8.40

$25.20

Direct labour hours per unit

0.40

1.20

Annual production

30,000

10,000

The company's estimated total manufacturing overhead for the year is $1,464,480 and the company's estimated total direct labour-hours for the year is 24,000. The company is considering using a variation of activity-based costing to determine its unit product costs for external reports. Data for this proposed activity-based costing system appear below:

Activities and Activity Measures

Estimated Overhead Cost

Supporting direct labour (DLHs)

$552,000

Setting up machines (setups)

132,480

Parts administration (part types)

780,000

Total

$1,464,480

Activities

C18R

G19R

Total

Supporting direct labour

12,000

12,000

24,000

Setting up machines

864

240

1,104

Part administration

600

960

1,560

Mike, who is the controller of the Company, is currently overseeing the project to switch from traditional costing to Activity-Based costing. He is in a meeting with the Cost Accountant of the company. The Controller goes over the data and makes the following comments:

Activity-Based Costing is a revelation in the modern-day world of manufacturing Industry. If we are correctly able to categorize the various nature of work into essential levels, then we can dramatically trace the precise nature of the overheard activity.

Jacob, the Cost Accountant, quips, how can we classify those levels of activities? Do we have some mechanism to identify them?

Mike responds, Yes! We do.

Jacob then laments the pitfalls of the job order costing system, The production report will be out soon and usually, the allocation bases (including overhead allocations in job-order costing systems) are not entirely accurate. Mike, with a pause, That is exactly why we may eventually need to switch to the Activity-Based costing though it is comparatively difficult to implement with the cost and operations limitations involved in it.

Jacob adds, Another consideration to evaluate is the relationship between the cost of maximum (budgeted) capacity and idle capacity, since the company is likely to operate at maximum capacities during the time of peak demand. Moreover, our long-term goals of stable cost predictions and waste minimizations should also be kept in mind.

Alright! Let us calculate and analyze the quantitative and qualitative aspects of the data and other factors we have discussed in the meeting today and prepare the preliminary report for the CEO by this weekend. Mike with the final comments!

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!