Question: REQUIRED: a . What run quantity ( EPQ ) should be used to minimize total annual costs? b What is the length of a production
REQUIRED:
a What run quantity EPQ should be used to minimize total annual costs?
b What is the length of a production run in days?
c What is the cycle time?
d What would the average inventory be for this lot size?
e About how many runs per year would there be
f
If the manager wants to run another job between runs of this item, and needs a minimum
of days
per cycle for the other work, will there be enough time? Note: Cycle time Run time
Setup time must be greater than or equal to
g
During production, at what rate will inventory build up Note: Buildup rate is
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
