Question: Required information Problem 15-1A Production costs computed and recorded; reports prepared LO P1, P2, P3, P4 [The following information applies to the questions displayed below.)

Required information Problem 15-1A Production costs computed and recorded; reports prepared LO P1, P2, P3, P4 [The following information applies to the questions displayed below.) Marcelino Co's March 31 inventory of raw materials is $90,000. Raw materials purchases in April are $540,000, and factory payroll cost in April is $376,000. Overhead costs incurred in April are: Indirect materials, $56,000; indirect labor, $20,000; factory rent, $32,000; factory utilities, $22,000; and factory equipment depreciation, $60,000. The predetermined overhead rate is 50% of direct labor cost. Job 306 is sold for $665,000 cash in April. Costs of the three jobs worked on in April follow. Job 306 Job 307 Job 308 $ 28,000 24,000 12,000 $ 37,000 16,000 8,000 Balances on March 31 Direct materials Direct labor Applied overhead Costs during April Direct materials Direct labor Applied overhead Status on April 30 134,000 101,000 2 Finished (sold) 205,000 152,000 2 Finished (unsold) $120,000 103,000 2 In process Problem 15-1A Part 1 Required: 1. Determine the total of each production cost incurred for April (direct labor, direct materials, and applied overhead), and the total cost assigned to each job (including the balances from March 31). Job 306 Job 307 Job 308 April Total s s $ 28,000 24,000 12,000 37,000 16,000 8,000 65,000 40,000 20,000 From March Direct Materials Direct Labor Applied overhead Beginning goods in process For April Direct Materials Direct Labor Applied overhead Total costs added in April 134.000 101,000 205.000 152.000 120.000 103,000 459.000 356,000 Total costs (April 30) Finished (sold) Finished (unsold) In process Status on April 30 April 30 cost included in
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
