Question: Required information Problem C-1A Applying activity-based costing LO P1, P2, A1, [The following information applies to the questions displayed below.] Craftmore Machining produces machine tools

Required information

Problem C-1A Applying activity-based costing LO P1, P2, A1,

[The following information applies to the questions displayed below.] Craftmore Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records.

Production Activity

Indirect Labor

Indirect Materials

Other Overhead

Grinding

$

330,000

Polishing

$

135,000

Product modification

500,000

Providing power

$

255,000

System calibration

590,000

Additional information on the drivers for its production activities follows.

Grinding and Polishing

9,000

machine hours

Product modification

2,200

engineering hours

Providing power

17,000

direct labor hours

System calibration

200

batches

Job 3175

Job 4286

Number of units

180

units

2,250

units

Machine hours

300

MH

3,000

MH

Engineering hours

29

eng. hours

26

eng. hours

Batches

25

batches

75

batches

Direct labor hours

440

DLH

3,960

DLH

2. Determine overhead costs to assign to the following jobs using ABC

Job 3175

----------Activity Rate----------

Activity Driver Incurred

Overhead Assigned

Grinding and Polishing

Product modification

Providing power

System calibration

Job 4286

----------Activity Rate----------

Activity Driver Incurred

Overhead Assigned

Grinding and Polishing

Product modification

Providing power

System calibration

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!