Question: Required Prepare a flexible manufacturing overhead budget for the expected range of activity, using increments of 1,000 machine hours. Question #4 OMC Marine is trying

 Required Prepare a flexible manufacturing overhead budget for the expected range

Required Prepare a flexible manufacturing overhead budget for the expected range of activity, using increments of 1,000 machine hours. Question #4 OMC Marine is trying to establish the standard labor cost of a typical water-cool pump repair. The following data have been collected from time and motion studies conducted over the past month. Actual time spent on pump repair Hourly wage rate Payroll taxes Onsite setup and downtime Final adjustments and testing Fringe benefits 1.5 hours $18 10% of wage rate 10% of actual labor time 20% of actual labor time 25% of wage rate Required (a) Determine the standard direct labor hours per pump repair (b) Determine the standard direct labor hourly rate. (c) Determine the standard direct labor cost per pump repair. (d) If a pump repair took 1.75 hours at the standard hourly rate, what was the direct labor quantity variance

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!