Question: Research and submit data sheets for three different materials needed for the term project assigned this term. As a project engineer you are requested to
Research and submit data sheets for three different materials needed for the term project assigned this term.
As a project engineer you are requested to prepare a Procurement Schedule for the critical materials required for the project. Use the following project schedule and minimum times for submittal review and material delivery to fill the procurement schedule.
The contractor needs day to review supplierssubcontractors submittals
The Contractor needs day to order any material once approved by the architect
The Architect needs days to review each of the electrical roughin concrete masonry, plumbing, metal deck, fire sprinkler, drywall, ceramic tiles, and metal window submittals; and days to review each of the paint, fire alarm, toilet accessories, and carpet
The Suppliers need days to deliver electrical roughin paint and carpet; days to deliver concrete masonry. plumbing, fire sprinkler, ceramic tiles, metal window, fire alarm and toilet accessories; and days to deliver metal deck and drywall
All materials should be delivered to the site at least days before first needed
All dates and times should fall on business days
The project sehedule is hours per week hours days including Saturdays
Project Schedule
tableACTIVITY DESCRIPTION,tableDURATIONDAYStableEARLYSTARTtableEARLYFINISHShoringMayMayRebar: Footings,MayMayConcreteMayMayRebar: Foundation Wall,MayJunSteel: Embed, Bolts,MayJunDrywellMayMayElectrical RoughinMayJunPlumbing RoughinMayJunRebar: Slabs,MayJunCureSealMayMaySteel: Columns,MayJunConcrete Masonry,MayJunRebar: TiltUp Panels,MayJunTiltUp Panel,MayJunHM Doors,JunJunPlumbingJunJunHVACJunJul
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock