Question: Revise the scheduling analysis for the deterministic workload. Take into consideration process switching time. Assume that task switching time is 1 cycle. a. Fill out
Revise the scheduling analysis for the deterministic workload. Take into consideration process switching time. Assume that task switching time is 1 cycle.
a. Fill out the table below for FCFS scheduling
b. Fill out the table below for MLFQ scheduling with q=3

Process name arrival service time required start time finish time T W P mean
Step by Step Solution