Question: ROAD CONSTRUETIOY Please answer with complete solution, 3 . 1 1 . 2 Tabulated below are cored sample data, extraction and sieve analysis conducted on

ROAD CONSTRUETIOY
Please answer with complete solution,
3.11.2 Tabulated below are cored sample data, extraction and sieve analysis conducted on paved Cement-treated base (CTB), AC 28 and AC.14 layers. Marshall bulk specific gravity for 28 and Determine whether the paving works
\table[[Layer,AC28,AC14],[Mass of cored sample in air, (8),1231.7,985.8],[Mass of cored sample in water, (g),686.3,547.1],[Mass of cored sample saturated surface dry, (g),1239.6,986.3],[Bulk specific gravity of cored sample,,],[Degree of compaction, (%),,]]
\table[[Chainage,AC28,AC14],[Mass of sample, w1(g),1187.6,1151.3],[Mass of filter ring, w2g,14.1,14.2],[Mass of filter ring + filler, w3(g),14.7,15.6],[Mass of extracted sample, w4g,1124.2,1084.5],[Bitumen content, 100[w1-(w3+w4-w2),,]]
\table[[Sieve size,\table[[Percent passing (%)],[Grading Limits]],\table[[Mass retained on the specified sieve],[(g)]]],[CTB,ACB28,AC14,CTB,ACB28,ACW20],[50.0mm,100,,,0.0,,],[37.5mm,90-100,,,32.8,0.0,],[28mm,-,100,,-,0.0,0.0],[20mm,70-90,72-90,100,184.1,58.8,0],[14mm,,58-76,90-100,-,185.6,48.9],[10mm,45*70,48-64,76-86,166.7,103.5,217.1],[5mm,35-65,30-46,50-62,149.4,227.5,92.3],[3.35mm,32-46,24-40,40-54,=,85.4,173.7],[1.18mm,.,14-28,18-34,*,146.6,130.3],[600m,15*30,*,-,286.0,=,=
ROAD CONSTRUETIOY Please answer with complete

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!