Question: Saalfrank Corporation is considering two alternatives that are code - named M and N . Costs associated with the alternatives are listed below: Alternative MAlternative

Saalfrank Corporation is considering two alternatives that are code-named M and N. Costs associated with the alternatives are listed below:
Alternative MAlternative NSupplies costs$ 50,000$ 53,000Assembly costs$ 34,000$ 34,000Power costs$ 14,000$ 21,500Inspection costs$ 27,000$ 16,000
Required:
Which costs are relevant and which are not relevant in the choice between these two alternatives?
What is the differential cost between the two alternatives?