Question: Sampio bius Ui pistons produced each da Day 1 2 3 4 Mean x (mm) 156.9 151.2 151.6 157.5 156.6 Range R (mm) 4.0 4.4

Sampio bius Ui pistons produced each da Day 1 2 3
Sampio bius Ui pistons produced each da Day 1 2 3
Sampio bius Ui pistons produced each da Day 1 2 3
Sampio bius Ui pistons produced each da Day 1 2 3 4 Mean x (mm) 156.9 151.2 151.6 157.5 156.6 Range R (mm) 4.0 4.4 4.3 4.8 4.5 5 Uwe Lim109r more your response to two cocinar praces). d) What are the UCLR and LCLR using 3-sigma? Upper Control Limit (UCLR)= 7.82 mm (round your response to two decimal places). Lower Control Lmit (LCLR) = 0.98 mm (round your response to two decimal places). e) If the true diameter mean should be 155 mm and you want this as your center (nominal) line, what are the new UCL; and LCL:? Upper Control Limit (UCL)-mm (round your response to two decimal places). = Woerde Churrin traghes are produced in a torging process, and he diameter a ornal wat met een from to po prose and targeta dente have been a Mean Range Day TO 43 46 45 152 3 1516 4 1675 S 1966 What is the value of 115478 round your sponse to me decimales to What is the lo? R44 wmround your response to decimal places What are the UCL, and Lawing iga? Upper Control (UCL) 156.47 round your response to compact Lower Control Linet LCL 153,45 mnd your response to two decap d What are the UCL, and UCLA ? Upper Control (UCL) 7.mind your response to two deca Lower LGL 0 mm found your response to me of the date man should be 155 mm and you want this as your center nomine what we w UCL, La Upper Control Lim-m found your response to two decades

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!