Question: Sample Problem 2 A -3.00% grade meets a +5.00% grade near an underpass. In order to maintain the minimum clearance allowed under the bridge and

 Sample Problem 2 A -3.00% grade meets a +5.00% grade near

Sample Problem 2 A -3.00% grade meets a +5.00% grade near an underpass. In order to maintain the minimum clearance allowed under the bridge and at the same time introduce a vertical transition curve in the grade line, it is necessary to use a curve that lies 200 m on the back tangent and 100 m on the fonrvard tangent. The station at the beginning of the curve is 10 + 000 and elevation of 228 m. ' Det. the elevation at 10 + 040 ' If the uphill edge of the under side of the bridge is at station 10 + 220 and at elevation 229.206 m, what is the vertical clearance under the bridge at this point? Determine the stationing of the lowest point of the curve

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!