Question: Section 7 : Project Management 1 2 . The critical path method ( CPM ) identifies: A ) The shortest path through a project B
Section : Project Management
The critical path method CPM identifies:
A The shortest path through a project
B The longest path through a project
C The most critical activities in a project
D The total project duration
Section : Lean Manufacturing
The concept of "justintime" JIT production aims to:
A Maximize inventory levels
B Minimize lead times
C Increase production rates
D Reduce waste