Question: SECTION ( B ) B 1 Cement volume calculations. Determine: The volume of cement The required number of sacks of cement 2 The volume of

SECTION (B)
B1 Cement volume calculations. Determine:
The volume of cement
The required number of sacks of cement 2
The volume of mixwater required 2
The volume of displacement |2|
Top of the spacer [3]
Hydrostatic pressure generated during the cementing operations |3|
Task: The 1338'' intermediate casing string of a well is to be cemented in place with a lead and tail cement. The details of the operation are as follows:
\table[[20'' previous casing set at,2800'