Question: Sequence: Activity Exposed Persons Current Status and Danger Risks Risk Estimation * Current Risk Assessment Level Precautions Risk Prevention * Level of Risk Assessment after
| Sequence: Activity | Exposed Persons | Current Status and Danger | Risks | Risk Estimation | * Current Risk Assessment Level | Precautions | Risk Prevention | * Level of Risk Assessment after Action |
| **P x D = RE | **P x D = RE | |||||||
| 1. Fuse Box | All Staff | No Leakage Current Relay | Electric Shock, Injury, Death, Fire | 4 x 4 = 16 | 4 | Regulation of Residual Current Relays | 1 x 3 = 3 | 2 |
| 2. Fuse Box Rubber Mat | Related staff | No rubber mats in front of panels | Electric Shock, Injury, Death | 3 x 4 = 12 | 3 | Placing a rubber mat in front of panels | 1 x 3 = 3 | 2 |
| 3. Cleaning of foods and hygiene | Kitchen Staff and Customers | Degeneration of biological agents from meat and vegetables | Illness of employees and customers | 4 x 5 = 20 | 4 | Kitchen staff training and the use of personal protective equipment | 1 x 4 = 4 | 2 |
| * Risk Assessment Levels: 1. Acceptable 2.Low 3.Medium 4.High 5. Not tolerable **Probability x Severity = Risk Essesment | ||||||||
Answer questions 1 to 5 for the given Risk assessment table.
Q1. Which method was used for the risk assessment score of the given table?
A) 4x4 Matrix
B) 5x5 Matrix
C) Fine Kinney
D) Hazop
E) FMEA
Q2. Which is correct for the Risk evaluation 1 in the Table?
A) The risk assessment score has been reduced with personal protective equipment.
B) Administrative methods have been intervened.
C) Post-Action Risk will be reduced to an Acceptable Level.
D) Current Risk level is high.
E) Post-measure risk level will be reduced to medium level.
Q3. Which is correct for the Risk evaluation 2 in the Table?
A) The risk assessment score has been reduced with personal protective equipment.
B) Administrative methods have been intervened.
C) Post-Action Risk will be reduced to an Acceptable Level.
D) Current Risk level is high.
E) Risk after Precaution will be reduced to Low level.
Q4. Which is correct for the Risk Assessment Table?
A) Existing risk assessment level is highest 5 x 5 = 25 Tolerable.
B) Risk score has been decreased by organizational method.
C) The risk score was reduced by the substitution method.
D) The lowest risk level after the measure is 2 points.
E) The highest Risk score that the table may contain is 20.
Q5. Which is correct for the Risk evaluation 2 in the Table?
A) Only the risk assessment score has been reduced with Personal protective equipment.
B) Administrative methods have been intervened.
C) Post-Action Risk will be reduced to an Acceptable Level.
D) Current Risk level is high.
E) Customers are in the risk group.