Question: Seven jobs must be processed in two operations: A and B. All seven jobs must go through A and B in that sequence-A first, then

Seven jobs must be processed in two operations: A

Seven jobs must be processed in two operations: A and B. All seven jobs must go through A and B in that sequence-A first, then B. Determine the optimal order in which the jobs should be sequenced through the process using these times: Job Process A Process B Position in Time Time Sequence 8 7 8 9 1 2 N 3 9 5 4 4 7 6 5 1 2 | N | | 6 2 3 7 4

Step by Step Solution