Question: SFC Programming 7 0 Marks Question 1 Scenario: In an industrial process control class, students are tasked with creating a Sequential Function Chart ( SFC

SFC Programming 70 Marks
Question 1
Scenario:
In an industrial process control class, students are tasked with creating a Sequential Function Chart (SFC) program for an
automated tank filling and draining system. The system involves a tank that needs to be filled using Valve 1 until Level Switch
1 is triggered. Once triggered, the tank should be drained through Drain Valve 2 until Level Switch 2 is triggered. The cycle
then repeats with the tank being filled again.
SFC Program Requirements:
Design an SFC program to control the tank filling and draining process based on the provided scenario.
Question 1:
Explain the Sequential Function Chart (SFC) approach and its significance in industrial process control. (10 marks)
Based on the scenario, write down the sequence of steps for the SFC program, including transitions and control
actions. (15 marks)
Describe how the program will ensure the tank is filled by opening Valve 1 until Level Switch 1 is triggered. Include
the necessary decision points and transitions. (15 marks)
Explain the logic your SFC program will use to drain the tank using Drain Valve 2 until Level Switch 2 is triggered.
Address any potential challenges in this process. (15 marks)
Discuss the overall efficiency of the SFC program in managing the tank filling and draining process. Are there any
potential improvements to optimize this process? (15 marks)
Mark Allocations:
1. SFC Program Understanding and Significance (10 marks):
Clear explanation of SFC and its importance in process control (5 marks)
Discussion of advantages of using SFC in the given scenario (5 marks)
2. SFC Sequence and Control Logic (15 marks):
Correctly sequenced steps and transitions (8 marks)
Appropriate use of symbols and control actions (7 marks)
3. Tank Filling Logic and Transitions (15 marks):
Accurate representation of Valve 1 opening and Level Switch 1 triggering (8 marks)
Tank Draining Logic and Challenges (15 marks):
Accurate representation of Drain Valve 2 opening and Level Switch 2 triggering (8 marks)
Discussion of potential challenges and solutions (7 marks)
5. Efficiency and Process Optimization (15 marks):
Evaluation of the efficiency of the SFC program (7 marks)
Identification and explanation of potential process optimization strategies (8 marks)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!