Question: Shiv Roy and her design team created the system below: R2 = 0.89 RA = 0.96 R4 = 0.97 Rz = 0.89 The overall reliability

Shiv Roy and her design team created the system

Shiv Roy and her design team created the system below: R2 = 0.89 RA = 0.96 R4 = 0.97 Rz = 0.89 The overall reliability of the system =% (enter your response as a percentage rounded to two decimal places). (round your If $3,000 must be spent to fix a failed system, what is the expected failure cost of the system? $ response to the nearest dollar). If the team proposes to add a backup component with 0.60 reliability to R1, how much should they pay for the backup at most? $ (round your response to the nearest dollar)