Question 1
Roadway, Inc, is a highway contractor that has been awarded a contract to mill and pave a 37 mile section of Interstate 10 in the Phoenix metro area.
The government has requested a cost analysis of two alternatives:
The cost to perform the work under straight-time normal working conditions
The cost to perform the work under a combination of straight-time and a second shift In preparing your analysis you arrived at the following numbers:
Under straight-time hours the highway crew with equipment works at a rate of 0.032 labor-hour/tons.
The highway is 3 lanes each direction, has a 10 foot shoulder on all sides (4 shoulders total), and has 3 layers of 4 inches, 3 inches and 2 inches respectively. Each lane is 13 feet wide and asphalt has a density of 145lbscf.
The crew consists of two working foreman, eight laborers, and three equipment operators (equipment includes a paver, a tandem roller, and a pneumatic roller). The average base cost for the crew is $37.15 per labor-hour
Shift work rates are 7.5 hours at 8 and a 20% differential
5. Assume no productivity drop
6. The second shift requires an extra cost of $2400/day for lighting
7. The government estimates an opportunity cost of $3200/day for every day the highway is under construction.
Show all calculations and formulas within your

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!