Question: show all the work please 2. (15pts) Two survey points with known coordinates, 1 and 2, are marked on the sidewalk outside a construction site.

show all the work please show all the work please 2. (15pts) Two survey
2. (15pts) Two survey points with known coordinates, 1 and 2, are marked on the sidewalk outside a construction site. A total station is set up on point 2. The instrument operator sights point 1 and sets a zero angle. The survey crew needs to stake out point 3 which is a theoretical design point from the construction drawings, and place a stake in the ground. Point 1: N103 E241 Point 2: N103 E389 Point 3: N158 E314 Elevation 59.16 a. What angle (to the right) is required to sight point 3 through the instrument? b. What distance is required from point 2 along the angle (from part a) to stake out point 3? c. After the crew locates the horizontal position of point 3 and drives the stake into the ground, the resulting elevation of the top of the stake is 53.81'. What is the cut or fill which should be written on the stake? Give both the distance and the direction (cut or fill)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!