Question: show all work In a certain standard costing system the following results occurred last period: total labor variance, 2,000 F; labor efficiency variance, 2,800 F;

show all work

 show all work In a certain standard costing system the following

In a certain standard costing system the following results occurred last period: total labor variance, 2,000 F; labor efficiency variance, 2,800 F; and the actual labor rate was $.20 more per hour than the standard labor rate. The number of direct labor hours used last period was