Question: Sipro Plastics Sdn Bhd (SPSB) is a small and medium enterprise (SME), act as a vendor for Perodua which is specialized in manufacturing car accessories

Sipro Plastics Sdn Bhd (SPSB) is a small and

Sipro Plastics Sdn Bhd (SPSB) is a small and medium enterprise (SME), act as a vendor for Perodua which is specialized in manufacturing car accessories parts such as meter cluster. With 100 staffs includes administrative staff, the factory's space is constraint. The operations involve is injection moulding (semi and fully automated). SPSB may produce 100 to 10000 units of products per month. Meter cluster is wrapped with plastic before placed in boxes. Meter Cluster with scratch surface will be rejected by QC inspection. Trolley used to transfer the meter cluster from production lines to quality section while pallet jack used to move end product from quality section to logistic section and warehouse. This meter cluster is stored in racks before delivery. a) Classify five (5) principles in material handling. (5 Marks) b) Determine current material handling and storage system in SPSB. (5 Marks) c) Identify problems and limitation faces at the current material handling system at SPSB.] (5 Marks) d) In your opinion, did SPSB need improvement in their current design of manufacturing system? If yes, evaluate your suggestions of improvement. If no, what should be remained

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!