Question: SITUATION 1 7 ( 7 2 - 7 4 ) : Earth is required to be excavated from borrow pits for building an embankment. The
SITUATION : Earth is required to be excavated from borrow pits for building an embankment. The wet unit weight of undisturbed soil is and its water content is In order to build a m high embankment with top width m and side slopes :The dry unit weight required in the embankment is Assume
Determine the void ratio of the undisturbed soil.
a
c
b
d
Determine the void ratio of the remolded state
a
c
b
d
Estimate the quantity earth required to be excavated per meter length of the embankment.
a
c
b
d