Question: Situation 6 For a given project it is estimated that 1 5 0 kg of steel can be installed in one hour using the following

Situation 6
For a given project it is estimated that 150 kg of steel can be installed in one hour using the following equipment and labor
1 bar bender P 50/ hr
1 bar culter P 50/hr
1 Foreman P 80/hr
8 Skilled workers P 50/hr q P 40/hr
8 Un-skilled workers ....35/hr Reinforcing steel costs P 15k
per kg. For every 1 kg of reinforcing steel, 0.02 kg of tie wire is required where 1 kg of tie wire costs P 26. The value added Tax is 10% of the material cost. The profit, contingency, and miscellaneous cost is 40% of the labor and material costs. Determine the following:
24. The cost of labor & equipment per kilogram (5.2)
25. The cost of materials per kilo gram (15.52)
10
wio
21726. The unit cost of the project per kilogram (30.21)
orations' revienuees. Unanithorized reproduction, use, or dissemination, ted to the full extent of the luri.
Situation 6 For a given project it is estimated

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!