Question: Six Sigma programsGroup of answer choicesutilize advanced statistical methods to improve quality by reducing defects and variability in the performance of business processes.suggest that all
Six Sigma programsGroup of answer choicesutilize advanced statistical methods to improve quality by reducing defects and variability in the performance of business processes.suggest that all activities can be controlled, employee empowerment is the best control tool, and 100 percent control is possible.are based on three principles: (1) all work is a statistically controllable process; (2) no well-controlled process allows variability; and (3) defect-free work requires tight statistical controls.consist of a disciplined, statistics-based system aimed at producing not more than 2.5 defects per million iterations for a manufacturing or assembly process.radically redesign and streamline how an activity is performed.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
