Question: sn:Pls help for this programing problem in c++ (standard IO without file read/write),better with some comment about why coding that way,thanks Problem C: The Snail
sn:Pls help for this programing problem in c++ (standard IO without file read/write),better with some comment about why coding that way,thanks

Problem C: The Snail A snail is at the bottom of a 6-foot well and wants to climb to the top. The snail can climb 3 feet while the sun is up, but slides down 1 foot at night while sleeping. The nal has a fatigue factor of 10%, which means that on each successive day the snal Climbs 10% x 3 0.3 feet less than it did the previous day. (The distance lost to fatigue is always 10% of the first day's climbing distance.) On what day does the snail leave the well, i.e., what is the first day during which the snail's height exceeds 6 feet? (A day consists of a period of sunlight followed by a period of darkness.) As you can see from the following table, the snail leaves the well during the third day. Day Initial Height Distance Climbed Height After Cimbing Height After Sliding 0 3 2.7 2.4 3 4.7 6.1 2 3.7 3.7 Your job is to solve this problem in general. Depending on the parameters of the problem, the snail will eventually either leave the well or slide back to the bottom of the well. (In other words, the snail's height will exceed the height of the well or become negative.) You must find out which happens first and on what day Input The input file contains one or more test cases, each on a line by itself. Each ine contains four integers H, U, D, and F, separated by a single space. IfH- o it signals the end of the input; otherwise, all four numbers will be between 1 and 100, nclusive. H is the height of the well in feet, U is the distance in feet that the snail can climb during the day, D is the distance in feet that the snail slides down during the night, and F is the fatigue factor expressed as a percentage. The snail never climbs a negative distance. If the fatigue factor drops the snairs dimbing distance below zero, the snal does not climb at all that day. Regardless of how far the snail climbed, t always slides D feet at night. Output For each test case, output a line indicating whether the snail succeeded (left the well) or failed (slid back to the bottom) and on what day. Format the output exacty as shown in the example. Sample Input 63110 102150 5053 14 50 641 50 631 Sample Output success on day 3 failure on day4 failure on day 7 failure on day 68 success on day 20 failure on day 2
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
