Question: solve for doctor well testing 3. Following completion, a 18 well is produced for some time, believed to be in transient behavior, before shut in

solve for doctor well testing
solve for doctor well testing 3. Following completion, a 18 well is

3. Following completion, a 18 well is produced for some time, believed to be in transient behavior, before shut in for a lengthy build up test. The production history is summarised below: Np=qt 24hr If the fluid and reservoir properties are summarised as ionows. k=65md,h=50f,=0.22,=0.85cp,0=1.35rb/stb,Ct=35.0E06psi1, and pi=3500psi. I. Calculate the minimum drainage radius. II. Calculate the wellbore pressure at the end of the seventh day using Horner's approximation if applicable or any other method if it doesn't

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!