Question: SOLVE IN 30 MINS a) Using Johnson's rule for 2-operations scheduling, the sequence is: Scheduled Order Job 1 Q N O M R P 2

SOLVE IN 30 MINS a) Using Johnson's rule for 2-operations scheduling, the sequence is: Scheduled Order Job 1 Q N O M R P 2 Q P N M R O 3 O N Q P R M 4 P R O M Q N 5 Q P N O M R 6 b) For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs = enter your response here hours (enter your response as a whole number). . . . Question content area right Part 1 An Engineering firm that produces a small parts for automobiles has received the following set of six jobs that needs to be processed through two operations at their production facility. The sequence of operations is to first design the jobs according to the specification using a software system, then manufacture the product in their assembly line. Processing time at each of the operations is shown below. Job Operation 1 (hours) Operation 2 (hours) M 12 4 N 8 11 O 5 14 P 6 2 Q 9 10 R 3 1

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!