Question: solve now please Assignment (2): CH 7: ABC Leader Corporation manufactures two products: Product O95C and Product M3IN. The company uses a plantwide overhead rate
Assignment (2): CH 7: ABC Leader Corporation manufactures two products: Product O95C and Product M3IN. The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates its manufacturing overhead to four cost pools. The following additional information is available for the company as a whole and for Products O95C and M31N Activity Cost Pool Activity Measure otal Cost Total Activity Machining Machine setupsNumber of setups Product design Order size Machine-hours 207,000 9,000MHs 140,000 350setups 2products Number of productsS 98,000 Direct labor-hours340,0000,000DLH s Activity Measure Product 0950Prodct M3I N Machine-hours Number of setups Number of products Direct labor-hours 3,000 160 6,000 190 4,000 6,000 Required: 1.Compute the plantwide (POHR) overhead rate. 2. Using the plantwide overhead rate, how much manufacturing overhead cost would be allocated to Product 095C? 3. Using the ABC system, compute the activity rate for each activity cost pool. 4. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product 095C
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
