Question: solve part b ) You are the engineer responsible for the rotary drum filtration unit. The plant increase the sturry rate to 0 . 1
solve part b You are the engineer responsible for the rotary drum filtration unit. The plant
increase the sturry rate to You know the maximum design cake discharge rate
is ycle. The drum operates at a cycle time of minutes.
a If the solids in the slurry is solid slurry, will your unit be able to process
the new slurry rate of answer is kg solidcycle
b What is the maximum rate of filtrate kg that your unit will generate under