Question: Solve problem in picture please Part 1 : Forced Convection Heat Transfer Through a Tube Bank A plan to use a steam powered preheater to
Solve problem in picture please Part : Forced Convection Heat Transfer Through a Tube Bank
A plan to use a steam powered preheater to raise the incoming fresh air to a deck air handler from a planed circmathrmC to circmathrmC The air duct has a width mm with the tube spacings of mathrmSmathrmLmathrmSmathrmTmathrm~mm The tubes of a prebuilt assembly can be as many as tubes in the transverse direction and tubes in the longitudinal direction. The air velocity is measured at mathrm~mmathrms at the inlet of the tune assembly. The tube surface is held at circmathrmC How many of the units are needed in series to reach the goal of reheating to a temperature higher than circmathrmC
Problems
A Determine the total rate of heat transfer to the air and the temperature of the air leaving the duct heater of one set of heating elements.
B How many sets of heating elements would be needed to just meet the design goal? What would the temperature be after the units if not regulated to circmathrmF
C What would the pressure drop be after the units
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
