Question: solve the 3 determined at the end please The RDC Manufacturing company produces 2 types of containers Type Abnd Type B, the two products have

solve the 3 determined at the end please
solve the 3 determined at the end please The RDC
The RDC Manufacturing company produces 2 types of containers Type Abnd Type B, the two products have different routing as shown in Figure 1. The finishing part of the production system is shown below. Burnishing 1 Products A&B Products A&B Product A Assembly Packaging Burnishing 2 Product B Figure 1 Spray Painter Hot Dryer The Company operates 2 shifts/day, 5 days per week for 50 weeks/year. Data collected from the operations during 2016 and 2017 are shown below. The Assembly, Painting, and Dryer operators are paid $20/hr. All other operators are paid $15/hr. Machine downtime cost is about $30 per hour. Assume one operator per machine Machine Data collected for: # of hours down Assembly 12 months 85 Burnishing 1 3 months 42 Burnishing 2 3 months 59 Painting 6 months 64 Drying 6 month 58 Packaging 3 months 46 DETERMINE (1)- Overall availability of the system 2). The bottleneck operation (The answer could be painting, burnishing system,....) 3). Sloss per year due to loss of availability

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!