Question: Solve the following network programming problem using SolverStudio: A distribution company produces its product at two different factories (50 units at F1 and 40 units

Solve the following network programming problem using SolverStudio: A distribution company produces its product at two different factories (50 units at F1 and 40 units at F2) to meet a demand for its product at its two warehouses (30 units at W1, and 60 units at W2), sometimes via a distribution center (DC). From F1 it costs 900 S/unit to ship to W1, 400 $/unit to ship to DC, and 200 S/unit (up to 10 units) to ship to F2. From F2 the units can only be shipped to DC at a cost of 300 $/unit. From DC a maximum of 80 units can be shipped to W2 at a cost of $100/unit. In addition units can be shipped from W1 to W2 at 300 $/unit, and from W2 to WI at $200/unit. How should the goods be shipped to minimize transportation cost? Find the SolverStudio instruction and examples (which I covered during the class two weeks ago) in the portal
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
