Question: -Solve the transportation model for the minimum cost production schedule for the products and machines. Show the production schedule. - Determine the cost (in dollars)


-Solve the transportation model for the minimum cost production schedule for the products and machines. Show the production schedule.
- Determine the cost (in dollars) of the production schedule.
The Ace Manufacturing Company has orders for three similar products. Three machines are available for the manufacturing operations. All three machines can produce all the produc the machine used. Machine capacities for the next week and the unit costs are shown below. (a) Develop the linear programming formulation of this problem. (Let xA1 be the number of units of produc MinxA1+1.3xA2+1.1xA3+1.2xB1+1.4xB2+xB3+0.9xC1+1.2xC2+1.2xC3 Machine 1 Capacity Machine 2 Capacity Machine 3 Capacity Product A Orders xA1+xA2+xA3=2000 Product B Orders xB1+xB2+xB3=300 Product C Orders xC1+xC2+xC3=1100 xij0 for all i,j. Solve the transportation model for the minimum cost production schedule for the products and machines. Show the production schedule. (xA1,xA2,xA3,xB1,xB2,xB3,xC1,xC2,xC3)=(300,1100,300,0,0,300,1100,0,0,x) Determine the cost (in dollars) of the production schedule
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts