Question: Solve Time left 1:28:51 Hide In an underground copper mine stope mining, the ore reserves planned to be mined is 10, 000 ton. After completion

Solve

Time left 1:28:51 Hide In an underground copper mine stope mining, the ore reserves planned to be mined is 10, 000 ton. After completion of the stope mining, the ore extracted is 10,500 ton, of which 1,500 ton is waste unintentionally mined. Calculate the ore recovery and dilution rates in this tope mining. If the in-situ copper ore grade is 3% and the waste is at the grade of 0.3%, what is the average grade of the extracted ore from this stope. A BIUS